Quoting Software for UK General Contractors
Prepare itemised quotes for repairs, call-outs and small refurbishments. Include labour, materials and subcontractor work, then send a branded PDF for a signed customer response.
Create a CostForge accountFor mixed-trade projects: confirm site measurements, labour rates and exclusions yourself.
The problem
General contractors need reusable structure without rigid quoting
One week it's a bathroom refurbishment, the next an urgent repair or a small commercial maintenance job. Start with a reusable item group, then review access, materials, labour, subcontractor scope and exclusions for the property in front of you. CostForge organises those costs into editable quote items; it does not survey the site or discover hidden defects for you.
Reusable quote templates
Start with a familiar work package, then verify every line.
Save repeated repair or refurbishment scopes as editable quote templates. Each new job needs its own measurements, access assumptions, material prices and labour allowance.
Explore quote templatesExample template for general contractors
Small refurbishment: access and setup, repair work, materials, specialist subcontractor allowance, waste and making good
Save the structure once, import it into a new quote, then adjust items, hours and pricing for the job in front of you.
Frequently asked questions
Questions from general contractors evaluating quoting software
- Can I include call-out fees and out-of-hours rates?
- Yes. Add them as named line items using rates you have set or checked yourself. CostForge does not determine local market rates.
- Does CostForge measure the site or diagnose faults?
- No. You assess the scope, quantities, access and underlying condition. CostForge helps organise your estimate and prepare a customer-facing quote.
- How should unexpected work be handled?
- Identify assumptions and exclusions before acceptance. If new work is uncovered, agree the scope and revised price with the customer rather than assuming the original quote covers it.
- Can clients accept a quote online?
- Yes. The supported quote-response flow lets clients review and sign an accept-or-decline response. It is not a substitute for a project contract or specialist certification.
Related resources
Keep exploring CostForge for your work
The solution
Structured costs for jobs that involve more than one trade
Editable, Mixed-Trade Quotes
Build separate item groups for repairs, materials, specialist subcontractors and making good. Reuse a saved quote structure, then check every quantity and rate.
Itemised Call-Out Charges
Include attendance, assessment, minimum labour charges and travel explicitly, so the customer can review them with the rest of the quoted work.
Out-of-Hours Labour
Enter the rate you actually charge for evening or emergency attendance. CostForge does not set or verify your call-out rates automatically.
Clients, Jobs and Quote History
Keep clients, related jobs and their quotes connected so your team can refer back to the agreed scope when planning follow-on work.
Branded PDF and Signed Response
Prepare a client-facing quote that omits internal margin detail, then send it for an online accept-or-decline response with a signature.
Worked contractor quote
How to price a small mixed-trade refurbishment
This is a fictional arithmetic example, not a recommended UK charge-out rate or a live CostForge quote. Assume the contractor has measured the site, confirmed access and obtained a provisional subcontractor allowance.
| Quote costing input | Illustrative amount |
|---|---|
| Site assessment: 2 hours × £32 | £64 |
| Repair labour: 24 hours × £32 | £768 |
| Materials and consumables | £480 |
| Specialist subcontractor allowance | £350 |
| Waste and access | £165 |
| Allocated overhead | £173 |
| Modelled job cost | £2,000 |
| Illustrative 20% markup on cost | £400 |
| Selling price before applicable VAT | £2,400 |
A 20% markup on £2,000 costs adds £400, giving £2,400 before any applicable VAT. The £400 is 16.67% of the selling price: markup is not gross margin. Check that labour rates cover employment and overhead costs without counting overhead twice. A provisional subcontractor allowance should be clearly labelled and confirmed before a fixed price is agreed.
Specify the room or repair area, workmanship, access, waste, finish and what is excluded. If opening up reveals hidden defects, document and agree the additional scope and price before proceeding. VAT treatment depends on the work and circumstances: see HMRC VAT Notice 708.
For a no-signup starting point, use the free construction quote CSV or check hourly costing with the UK labour cost calculator. Both are resources to adapt, not automatic site surveys.
Scope review
Make assumptions, charges and exclusions clear in writing
A call-out or first-hour minimum is discussed verbally but omitted from the written quote.
List the attendance, diagnostic time and minimum charge as separate quote items, explaining what follow-on work is excluded.
Emergency work is priced before the full fault or site conditions are known.
State the out-of-hours labour rate, initial scope and assumptions. Price any additional work separately for approval before proceeding.
A repair quote mixes your own labour with materials and an unconfirmed specialist subcontractor.
Separate labour, materials and subcontract allowances; identify who confirms quantities and costs and what remains provisional.
Pricing
See current CostForge plans in one place
Plan options, billing terms, limits and current commercial details are maintained on the pricing page.
Create a clear quote for your next mixed-trade job
Organise clients and jobs, build itemised quotes and send them for a signed customer response.
Create a CostForge accountCostForge supports commercial quoting; check the scope, safety requirements and contractual terms for each job.