Free UK construction quoting tool
Construction quote generator and calculator for UK trades.
Enter your own labour hours, hourly rate, material costs, markup and VAT rate to calculate a working total. Copy the result, then check the full scope, overheads and terms before sending a client quote.
Generator inputs
Build a quote starting point
Generated quote summary
Example construction job
Labour and materials for the agreed scope
Indicative client total
£3,283.20
Use this as a planning aid. A complete quote should also cover overheads, allowances, exclusions, payment terms, supplier costs and the confirmed scope of work.
Worked construction quote example
How the calculator reaches its total
The calculator opens with an illustrative job: 24 labour hours at £45 per hour, £1,200 of materials, 20% markup and an example 20% VAT rate. These are sample inputs, not recommended UK trade rates or a finished customer quotation.
| Step | Calculation | Amount |
|---|---|---|
| Labour | 24 hours × £45 | £1,080.00 |
| Materials | Entered cost | £1,200.00 |
| Direct cost | Labour + materials | £2,280.00 |
| Markup | 20% × £2,280 | £456.00 |
| Subtotal | Direct cost + markup | £2,736.00 |
| Illustrative VAT | 20% × £2,736 | £547.20 |
| Indicative total | Subtotal + illustrative VAT | £3,283.20 |
Markup is not profit margin
Here £456 is 20% of the £2,280 modelled cost, but only about 16.7% of the £2,736 selling price before VAT. That is not a verified net profit margin: any omitted costs reduce the real result. Check your pricing with the markup and margin calculator.
Check the hourly rate and missing costs
If the £45 hourly input is already a customer charge-out rate containing overhead and profit, adding markup again may double-count the uplift. If it is an internal cost rate, first allow for non-billable time and business overhead. See the UK labour cost calculator and building-job pricing guide.
VAT is not automatic tax advice. The example uses a manually entered 20% rate. UK construction work may have different VAT treatment, including qualifying zero- or reduced-rated work and domestic reverse-charge cases. Check the circumstances against HMRC's buildings and construction VAT guidance before issuing a quote.
From generated total to client quote
A quote generator handles the arithmetic. The scope still matters.
The calculator gives you an indicative total from the figures you enter. It does not have separate inputs for subcontractors, waste, plant, access, travel or business overheads. Make sure those costs are covered in your pricing before you treat the result as a customer quote.
See quoting software for tradesChoose the right starting point
Generator, template or estimating workflow?
CostForge already has separate resources for these neighbouring intents, so you can use the tool that matches the job instead of forcing one page to answer every construction-estimating query.
Need an editable quote document?
Use the free construction quote template for client details, scope, line items, exclusions, VAT treatment, terms and acceptance structure.
Open the construction quote templateNeed a repeatable estimating workflow?
See how structured labour, line items, internal margin and reusable quote templates fit into CostForge’s construction estimating workflow.
Explore construction estimating softwareConstruction quote generator FAQs
Is this a construction quote generator?
Yes. Enter your own labour hours, labour rate, materials, markup and VAT rate to generate an indicative construction quote summary that you can copy. It is a planning tool rather than a substitute for checking the full scope, exclusions, overheads, supplier costs and commercial terms.
How do I calculate a construction quote?
Multiply labour hours by your hourly rate, add materials, then apply markup to that cost base. Add VAT only where applicable. Review overheads, subcontractors, exclusions, payment terms and scope before issuing a client quote.
What is the difference between a quote generator and a quote template?
A generator calculates a working total from inputs. A template gives you the document structure for client details, scope, exclusions, terms and acceptance. Use the generator for the numbers and the construction quote template when you need an editable document layout.
Does this calculator include overheads and subcontractors?
Not as separate fields. It calculates labour plus materials, markup and an entered VAT rate. Include any missing project costs and overhead recovery in your wider estimate before quoting; do not double-count costs already built into your hourly rate.
Is 20% markup the same as 20% margin?
No. A 20% markup on £2,280 of costs adds £456, producing a £2,736 pre-VAT price. That £456 is approximately 16.7% of the selling price, before any costs not included in the calculation.
Can the generator be used for different trades?
Yes. The inputs are intentionally trade-neutral, so builders, plumbers, electricians, roofers, landscapers, decorators and other project-based trades can use their own labour and material figures.