๐Ÿ—๏ธ Built for Plasterers

Plastering Quoting Software for UK Plasterers

Quote skimming, rendering, and dry-lining jobs with room-by-room area breakdowns, correct finish rates, and accurate material quantities โ€” then win more work with professional PDF quotes.

Start Free โ€” No Credit Card

Used by plastering contractors across the UK ๐Ÿ‡ฌ๐Ÿ‡ง

The problem

Plastering margins are tight โ€” every underestimated bag or undercharged finish type adds up fast

Clients push back on area-based pricing when they can't see what the mยฒ covers. Bag counts are easy to underestimate when you're working from total mยฒ rather than room-by-room. Remedial prep โ€” raking out, dot-and-dab, re-boarding โ€” takes real time that rarely makes it onto the quote. And specialist finishes need a higher rate that's hard to justify without showing the work behind the price. CostForge gives plasterers the structure to address all of this.

Clients push back on area-based pricing with no contextPlaster bags underestimated โ€” merchant run at your costRemedial work (dot-and-dab, raking out) underchargedDifferent finishes need different rates โ€” all charged the sameNew-build main contractors require written schedules

Reusable quote templates

Reuse room and finish scopes while adjusting every measurement.

Save a standard skim, boarding or render package with the usual preparation, materials and labour structure. Import it into a new quote and change room areas, finish specifications and remedial requirements.

Explore quote templates

Example template for plasterers

Standard room skim: protection, preparation, beads, plaster, two-coat skim, clean-down and labour

Save the structure once, import it into a new quote, then adjust items, hours and pricing for the job in front of you.

Frequently asked questions

Questions from plasterers evaluating quoting software

Can I quote plastering room by room?
Yes. Structure work by room or area, showing finish, materials and labour clearly in a professional quote.
Can I price skimming, rendering and dry-lining differently?
Yes. Use separate items and scopes for differing finish types, preparation needs and material requirements.
Can I save a repeat plastering work package?
Yes. Templates let you reuse a proven room or render scope and update measurements and costs for each survey.

The solution

Built for the way plasterers actually price work

Room-by-Room Quote Structure

Quote each room separately โ€” ceiling, walls, reveals โ€” with its own area, finish specification, and labour rate. Client sees the full scope room by room, not a single area total they can argue with.

Finish Specification per Area

Set different labour rates for two-coat skim, mist coat prep, sand and set, or venetian finish. Assign the correct rate to each area โ€” stop undercharging on specialist finishes.

Materials as Quantified Lines

Plaster bags, bonding, beads, scrim, and PVA โ€” each on their own line at merchant cost plus mark-up. Bag count calculated from area, not guessed. Materials margin protected.

Render Quote Structure

External render jobs need their own structure: scratch coat, top coat, beads, stop ends, and scaffolding. Keep internal and external work in separate sections with the right material and labour rates for each.

Professional PDF for Main Contractors

New-build main contractors and developers require written plastering schedules. Export a branded PDF with room-by-room areas and finish specifications โ€” win contracts from builders who need paperwork.

Before & after

What changes when plasterers use CostForge

Whole-house skim quoted as total mยฒ โ€” client challenges the price with no breakdown to justify it

Room-by-room PDF with ceiling area, wall area, reveal count, finish spec, and labour for each room. Client has context for every number on the quote.

Specialist venetian finish charged at the same rate as standard two-coat skim โ€” losing margin on every decorative job

Venetian plaster quoted at its own labour rate per mยฒ. Client sees the rate difference, understands the skill involved, and accepts the price.

Main contractor asks for a room-by-room plastering schedule to include in the build programme โ€” quote rejected because it's a single-line total

Branded PDF with each room listed by area and finish spec. Passes the MC's build programme requirement. Job awarded.

Pricing

Start free, scale as you grow

All features on every plan. You only pay for scale.

Free

ยฃ0/ month
  • Up to 3 clients
  • 5 jobs
  • 10 quotes
  • 1 user
Get Started Free

Perfect for sole-trader plasterers.

Most Popular

Pro

ยฃ29/ month
  • Unlimited clients
  • 30 active jobs
  • Unlimited quotes
  • 5 users
Start Pro Free

Enterprise

ยฃ59.99/ month
  • Unlimited clients
  • Unlimited jobs
  • Unlimited quotes
  • Unlimited users
Contact Sales

No credit card required ยท Cancel anytime

Stop quoting from memory.

Room-by-room quotes that win jobs and protect margin โ€” free to start.

Get Started Free

Trusted by plasterers across the UK ๐Ÿ‡ฌ๐Ÿ‡ง