Quoting and job costing for UK renewable installers

Solar PV, battery and heat pump quotes with costs you can check.

Organise equipment, installation labour, site allowances and client terms in a structured CostForge quote. Send a branded customer version and record a signed response, without mistaking quoting software for solar design, certification or a grant application system.

What to include

Make the renewable installation scope clear before the customer accepts.

A useful installer quote lets a buyer compare equipment and installation scope, not just one total. CostForge supports nested line items, saved labour roles and reusable quote structures; the installer remains responsible for the survey, design, technical suitability and supporting documentation.

Equipment and optional upgrades

List panels, inverter, mounting, cabling and isolators by confirmed specification. Show battery storage as a separate priced option when relevant.

Site work and labour

Allow for access, scaffolding or hire, electrical interfaces, installation hours and any work required by the actual survey.

Commissioning and handover

Include realistic time for testing, handover, documentation and any separately managed compliance work without claiming the quote PDF replaces that work.

Scope, terms and exclusions

Explain what is assumed, what is excluded, how long the price is valid, and which changes need a revised customer quote.

Prefer to start with a free document? The construction quote CSV template gives a downloadable scope and line-item starting point. It is not a system-design or grant-submission template.

Worked example — fictional figures

Separate the installation cost from the final selling price.

This illustrative PV installation uses made-up amounts, not current UK equipment prices, labour benchmarks or a system-sizing recommendation. Check every quantity, allowance and rate against the actual surveyed project.

Fictional UK solar PV installation quotation cost and markup example
Illustrative cost itemAmount
Panels, inverter and mounting components£4,200
Cables, isolators and electrical protection£650
Installation labour: 28 hours × £32£896
Access and equipment hire£380
Commissioning and handover allowance£320
Travel, waste and allocated site overhead£254
Total modelled cost£6,700
Illustrative 20% markup on cost£1,340
Selling price before applicable VAT£8,040

A 20% markup on £6,700 is £1,340; the resulting £8,040 price has a modelled gross margin of about 16.67%, not 20%. VAT treatment for installed energy-saving materials and other work must be checked for the actual supply; this example does not calculate VAT or claim that every installation qualifies for a particular rate. For pricing calculations, use the free markup and margin calculator.

A quote PDF is not a certificate, energy model or grant approval.

CostForge can organise and export commercial quote information, including equipment and labour lines. It does not claim to calculate solar generation, produce technical drawings, issue MCS certificates, submit DNO notifications or prepare an approved grant application.

Heat pump funding has separate eligibility and installer requirements. For example, Ofgem's Boiler Upgrade Scheme installer guidance explains the scheme's own process. Do not assume a solar PV quote or a CostForge PDF establishes eligibility, certification or acceptance by a scheme administrator.

Keep survey findings, specifications and regulatory documents with the responsible installer's established compliance process. Use CostForge for the supported client, job, quote and signed-response workflow.

Reusable quote templates

Reuse equipment-led quote structures without copying old assumptions.

Save an editable quote or item-group template for a typical solar PV, battery or heat pump job. For each new customer, update the equipment specification, quantities, labour hours, access and exclusions after checking the surveyed site.

Explore quote templates

Example template for solar & renewable installers

PV installation quote structure: panels and inverter, mounting, electrical protection, installation labour, access, commissioning, handover and exclusions

Save the structure once, import it into a new quote, then adjust items, hours and pricing for the job in front of you.

Frequently asked questions

Questions from solar & renewable installers evaluating quoting software

Can CostForge itemise panels, batteries and installation labour?
Yes. Use nested quote items for equipment and materials, plus staff-hours items with predefined roles and rates. Battery storage can be a clearly labelled option or separate work section.
Does CostForge calculate solar yield or size the system?
No solar generation modelling or automated system sizing is claimed. Carry out design and technical checks through the installer's normal competent process, then put the agreed specification into the quote.
Can a CostForge PDF be used as an MCS certificate or grant approval?
No. CostForge produces commercial quote PDFs; it does not claim to issue compliance certificates, submit grant applications or guarantee scheme acceptance.
Can I reuse a renewable installation quote?
Yes. Save a full quote or item group as a template, then adjust all scope, equipment, quantities and terms for the next job.
Where are current CostForge subscription details?
See the pricing page for up-to-date plans, entitlements and commercial terms.

Keep the installation scope and customer decision together.

Build a detailed commercial quote, generate a branded client version and capture a signed accept or decline response. Check current pricing separately for subscription details.

Create a CostForge account